Construction of hot water supply facility | |||
No : 272 Date : 2018-04-13 Views : 1048 | |||
There will be construction to improve the equipment and install additional hot water supply at the dormitory. Noise, dust and vibration are occurred during construction. Also there may be temporary power cut and water supply. We will proceed with the construction without inconvenience, but please cooperate on the inevitable inconvenience.
■ Period: 2018. Apr. 13. (Fri) ~ End of Jul. ■ Location: roof of Shin-gwan B building, Back of Ui-gwan ■ Notice of inconvenience - Some area traffic limits due to the operation using a large crane. - Noise, dust (we will deploy as many people as possible to ensure the construction is carried out in a short period.) - Temporary power cut and water supply (we will minimize the time using weekend).
If construction that could cause inconvenience will be started, we will give a full notice.
|
Next | Routine Elevator Inspection for April 2018-04-13 |
---|---|
Preview | Removal Work of Non Registered Bicycles and Motorcycles 2018-04-13 |