Comprehensive Thorough Inspection of Fire-Fighting Systems | |||
No : 46 Date : 2015-08-11 Views : 4163 | |||
Comprehensive Thorough Inspection of Fire-Fighting Systems
The 2015 comprehensive thorough inspection of fire-fighting systems is scheduled to be conducted as described belows. When the emergency public address, bell or siren is heard during the fire fighting systems inspection, please don’t be embarrassed to hear the sound. Every dorm resident’s cooperation for the safe inspection would be enormously appreciated.
1. Legal ground : INSTALLATION, MAINTENANCE, AND SAFETY CONTROL OF FIRE-FIGHTING SYSTEMS ACT, Article 25, and Enforcement Rules to the Said Act, Article 18 2. Inspection schedule - Shin-gwan A, B-dongs : 09:00~17:00, Aug. 17 (Mon) ~ 18 (Tues) - In, Ui, Ye-gwan’s : 09:00~17:00, Aug. 19 (Wed) - Ji-gwan : 09:00~17:00, Aug. 20 (Thu) 3. Inspection points : Checking the function of the said facilities, and the operational readiness.
|
Next | Routine Elevator Inspection 2015-08-11 |
---|---|
Preview | Registeration of August fitness center members from 30th of July 2015-08-11 |