Global Leading University

NOTICE

  • home
  • Information
  • Notice

Information

Notice

봉룡학사 | 공지사항 게시글의 상세 화면
Switch of heating and cooling (2022-Spring)
No : -1 Date : 2022-04-21 Views : 2549

The switch of  heating and cooling will be done like below. For a few days, both of them will be stopped for switching procedure.

 For students who want to use a fan, they can borrow a fan from information desk.

 

1. Schedule for Starting  the air conditioner and Filter cleaning

▶ Start Cooling : May. 02. (Mon) 09:00 ~

▶ Filter Changing/Cleaning: Apr. 25. (Mon) ~ May. 24. (Tue)

2. Air-conditioner Supply Time
 - 09:00 ~ 18:00

 The supply time can be changed by the temperature outside.

 

3. Change to Cooling with Remote Control

Shin-kwan students must change their remote control from Heating(wave shape)’  to  Cooling(snow flake shape)

 

4. Notice

Please understand that there may be some delay in cooler/heater maintenance during check up period and pre-operation period.
- Please note that even though the morning and daytime temperature are different, you cannot switch the mode. (heating or cooling).
- If any problem occur due to the switch of cooling/heating, please use repair service on the dormitory homepage.

5. Filter Changing/Cleaning Schedule 

 

Dorm

Floor

Date

Shin-kwan A

9,10F

04. 25

8F

04. 26

7F

04. 27

6F

04. 28

5F

04. 29

4F

05. 02

3F

05. 03

2F

05. 04

1F

05. 06

Shin-kwan B

15F,14F

05. 09

13F,12F

05. 10

11F,10F

05. 11

9F

05. 12

8F

05. 13

7F

05. 16

6F

05. 17

5F

05. 18

4F

05. 19

3F

05. 20

2F

05. 23

1F

05. 24

In-kwan

3F~4F

04. 25

1F~2F

04. 26

playersection3F~4F

04. 27

player section 1F~2F

04 28

Ui-kwan

1F

04. 29

2F

05. 02

3F

05. 03

Ji-kwan

11F

04. 25

10F

04. 26

9F

04. 27

8F

04. 28

7F

04. 29

6F

05. 02

5F

05. 03

4F

05. 04

3F

05. 06

2F

05. 09

1F

05. 10

 

*FAQ

Q. Why can't I use cooler in the afternoon and heater at night?

A. The cooling/heating machine which the dormitory use is not like a machine at normal house. The machine is controlled separately for each buildings, and there are huge central supply equipments. Cold/Warm wind is provided through these equipments to every room. Therefore, it is impossible to provide warm wind for some rooms and cold wind for the other rooms concurrently.

Sometimes students ask about changing heater/cooler from morning to night.

However, the central controling equipment has very complicated and sensitive system. The frequent chaning may occur problems, so that it become impossible for whole building to provide heater/cooler.

To ease this problem, dormitory has a few days of pre-operation or stopping operation period.

▼Pipes and pumps of Shin-kwan central controlling equipment

봉룡학사 | 공지사항 게시판의 이전글 다음글
Next ★General Admission Information for 2022 Summer vacation semester(Shin B / Ji-kwan) 2022-04-21
Preview 5월 방역/May Regular Sanitization and Disinfection 2022-04-21